Friday, January 30, 2009

My Reno Works List

It's really hard for me to relist everything i do A-Z, i will just list the main stuffs which I do. Total Final Reno Bill $28,500 (excluding Houseware, Sanitaryware, Lightings)
My place is 122sqm 5I

Living Room
Full Height Feature Wall which includes
Shoes Cabinet, Console, Feature for TV total 10 feet

Master Room
Hack two rooms into one
Lay hacked flooring with pebble wash
Full Height 4 feet study area (which the table can be converted into dresser)
Full Height Walk in Concept wardrobe area approx 13-14 feet

Kitchen & Service Balcony
Hacking of Existing Wall, Floor Tiles
Hacking of Sink Area and shifting from Service Balcony to Kitchen area.
Removing of old kitchen cabinets
Relay Floor Tiles for Kitchen & Service Balcony
I did not do wall tiles for Kitchen and Service Balcony
Full Height Kitchen cabinet 13feet top and bottom
Full Height Kitchen cabinet 2 feet top and bottom

Two Toilets
Hacking of Wall and Floor Tiles
Relay Wall and Floor Tiles
Glass Panels for both toilets
Cabinet & Solid Surface Top for Master Toilet

Painting for whole house
Revarnishing for Timbre flooring for Living, Dining, Bedrooms
Spraying Painting for Balcony Window Grilles

Will update if I can rememeber which I miss out above :D

Monday, December 1, 2008

My Little World Checklist

King Poster Bed ($1,000 Unikhome - Sungei Kadut)
King Mattress ($1,600 Mattress Salon - Sungei Kadut)
Sharp 46" LCD ($1,899 IT Fair)

Joven 35L Storage Heater, Rainshower + Spray Set with Mixer,
2 Barons WC, Shower Spray Set with Mixer, White Basin (Approx 1.6K from Lucky Khoon)

1 Sand Blast Basin, 1 Tall Tap, 1 Short Tap, 1 Kitchen Sink Mixer ($430 from Royal Franco)

1 Kitchen Sink Set + Hob + Hood (Approx 1.4K+ from Bellari)

Starmex Inverter System 3 (Approx 3.1K from Gaincity)

Curtains for whole house including WIW ($1150 from Ecurtain - AMK Ind Pk 1)

Lightings (Chelsea Jurong East $880)

Mini Console for Bedroom + Dining Set with 4 Chairs
(Scanteak $700+ during sale at Sungei Kadut)

Will update more later :)

Wednesday, September 17, 2008

My Kitchen (Completed)

I know! Very busy lah, not time to update the pictures.
Now Common Toilet & Curtain still pending for the time being until I take pictures. :)







My Kitchen Sink, Hood & Hob (Top and Bottom Cabinet)



On the right side of my kitchen (as in picture 1) shows the tall side cabinet for my
toaster and microwave.



My Hob from Bellari - Gourmet 3 Burners
My Kitchen Sink and Hood also from Bellari



My Pull-Out Sauce Rack
and all stainless steel racks and hanging bars all from
Wel-Mi (Hen Logo)

Curtains will be updated soon.
:)

Monday, August 18, 2008

Living Room (Part 2 - Feature)



My Feature Wall -
I opt for black tinted glass but the ID insisted on tinted mirror.
Overall effect is quite ok but i still feel that tinted glass is BETTER *humph*

The feature consists of Shoe Cabinet on the left side, approx 10 feet long TV feature and Suspended Console.

btw: wanted to take pictures of my opposite living area and piano area but too messy,
will update those pictures later. :P

My Living Room (Part 1)

Sorry for the mess (if any) as I have yet to complete my packing in their
right places.



Resort Style Aroma Burner (my stupid Bodyshop one design fault lah)
This one cheaper, only $13.50 LOL







My Dining Area (with Warm Lights ON & OFF)





Kitchen Tall Cabinets (from Living Room view)





Bomb Shelter Feature Wall (CLOSED & OPEN)









Friday, August 8, 2008

My Master Bedroom (Completed)

My Master Bedroom (Completed)
- Sleeping + Study Area + Dresser + Wardrobe + Toilet



Something Sweet to start off.
Like my "burberry style" cushion?






My Sleeping Area
(King Posterbed from Unkihome & TV Console from Scanteak)








My Study & Dresser (Combined)
All my cosmetics were in my giant traincase and I transferred them over to here.
hehe! Nice? 2.5feet drawer unit for my everyday routine.


My wardrobe area (OMG, don't ask me what's inside, hahha *sly grin*
my bag collection of course! :P







My Master Toilet (grumble** v small!)

Monday, August 4, 2008

My Progress - 5th August 2008





My Feature wall to be completed on Friday when the glass panels are up.
If you noticed, i made some adjustment to the actual thing.
Will request for revised 3D when my home is completed.